Bulletin of the American Physical Society
60th Annual Meeting of the APS Division of Plasma Physics
Volume 63, Number 11
Monday–Friday, November 5–9, 2018; Portland, Oregon
Session YP11: Poster Session IX: The crossover between high-energy-density plasmas and ultracold neutral plasmas ; Supplemental; Post-Deadline Abstracts (9:30am-12:30pm)
Friday, November 9, 2018
OCC
Room: Exhibit Hall A1&A
Abstract ID: BAPS.2018.DPP.YP11.48
Abstract: YP11.00048 : WEST first plasma operation with all tungsten plasma facing components
Presenter:
Clarisse Bourdelle
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Authors:
Clarisse Bourdelle
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Jérôme Bucalossi
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Nicolas Fedorczak
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Thierry Loarer
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Philippe Moreau
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Emmanuelle Tsitrone
(CEA, IRFM, F-13108 Saint Paul-lez-Durance, France)
Collaboration:
the WEST team : http://irfm.cea.fr/WESTteam/index.php
The transformation of Tore Supra into WEST, from limited to diverted magnetic configuration and from carbon to tungsten plasma facing components was completed at the end of 2016.
Plasma breakdown was readily obtained. Plasma current ramp up to 800 kA was achieved after the alteration of in-vessel copper passive structures. The operational window was narrow: at lower prefill pressure, no breakdown occurred while at higher prefill pressure, transition to electron slideaway discharges happened. After a first boronization, performed in July 2018, plasma startup window opened up. Slideaway electron discharges disappeared and higher plasma density was reached. Dedicated PFC diagnostics allow for first power deposition studies.
So far, up to 2.8 MW of LHCD and 0.6 MW of ICRH have been injected into the plasma with a fraction of radiative power around 60%. The radial electric field (measured by Doppler reflectometer) deepens inside the separatrix with additional power, although H mode has not be reached yet.
The ongoing phase of operation is dedicated to H mode access and test of the ITER-like plasma facing unit prototypes. A full ITER like actively cooled lower divertor will be installed in 2019. In this 2nd phase, the pulse length will be extended to 1000s.
To cite this abstract, use the following reference: http://meetings.aps.org/link/BAPS.2018.DPP.YP11.48
Follow Us |
Engage
Become an APS Member |
My APS
Renew Membership |
Information for |
About APSThe American Physical Society (APS) is a non-profit membership organization working to advance the knowledge of physics. |
© 2025 American Physical Society
| All rights reserved | Terms of Use
| Contact Us
Headquarters
1 Physics Ellipse, College Park, MD 20740-3844
(301) 209-3200
Editorial Office
100 Motor Pkwy, Suite 110, Hauppauge, NY 11788
(631) 591-4000
Office of Public Affairs
529 14th St NW, Suite 1050, Washington, D.C. 20045-2001
(202) 662-8700